spacer.gif, 43B spacer.gif, 43B
spacer.gif, 43B spacer.gif, 43B
    pic1.gif, 5,0kB pic4_o.gif, 259B pic2.gif, 5,6kB engl-1.gif, 255B
engl-8.gif, 176B
logo.gif, 1,4kB logo2.gif, 878B  
    pic3.gif, 5,9kB pic4.gif, 5,2kB pic5.gif, 6,1kB engl-3.gif, 185B
4.gif, 165B
REFERENCES
Extract about our services
 
 
  pic6.gif, 5,0kB engl-5.gif, 190B
engl-6.gif, 173B
 
pic7.gif, 4,6kB engl-7.gif, 149B
2.gif, 190B
 
engl-9.gif, 137B
engl-10.gif, 215B
 

PPSI  Engineering office
Dipl. Ing. Peter VESPERMANN
--
Grasehorstweg 36
D  -  12589 Berlin

Tel.: +49(0)30-654 898 60
Fax: +49(0)30-654 898 62

E-Mail:    office@ppsi.de

Single- and double family houses

Renovation of a listed “Art Nouveau” town house in Berlin-Lichterfelde

Measures

Gas fired condensing technology

Solar thermal technology

Insulate basement ceiling

Insulation of the roof 30 cm

Replacement of the windows

Basic data

Year of construction:
1896

Surface Area/An: 375 m²

Primary energy requirement
Before:   395 kWh/m²a
After:     158 kWh/m²a

Energy Savings: 61 %

CO2-reduction: 28.515 kg/a

Single family house with annexe to existing building in Berlin-Dahlem

Measures

Assembly of a wood-pellets-
fired central heating

Solar thermal technology

Ventilation and heat recovery

Replacement of the windows

Thermal insultaion of the facade

Insulate basement ceiling

Basic data

Year of construction:
1933 u. 1995

Surface Area/An: 423 m²

Primary energy requirement
Before:   209 kWh/m²a
After:     116 kWh/m²a

Energy Savings: 44 %

CO2-reduction: 41.167 kg/a

Detached-row-house in Berlin-Spandau

Measures

Gas fired condensing technology

Insulation of the facade with ecological insulating materials

Insulate basement ceiling

Basic data

Year of construction:
1984

Surface Area/An: 139,8 m²

Primary energy requirement
Before:   176,5 kWh/m²a
After:     95,4 kWh/m²a

Energy Savings: 46 %

CO2-reduction: 42.342 kg/a

Villa / detached house in Berlin-Hessenwinkel

Measures

Central heating with gas fired condensing technology

Solar thermal technology

Ventilation and heat recovery

Insulation of the facade with ecological insulating materials

Insulate basement ceiling

Basic data

Year of construction:
1911

Surface Area/An: 237 m²

Primary energy requirement
Before:   417 kWh/m²a
After:     65 kWh/m²a

Energy Savings: 84 %

CO2-reduction: 77.091 kg/a

Single family house in Berlin-Wilhelmshagen

Measures

Assembly of a wood-pellets-
fired central heating

Solar thermal technology

Insulation of the facade with ecological insulating materials

Insulate basement ceiling

Basic data

Year of construction:
1994

Surface Area/An: 237 m²

Primary energy requirement
Before:   180 kWh/m²a
After:     41 kWh/m²a

Energy Savings: 77 %

CO2-reduction: 6.163 kg/a

Double family house in Berlin-Hessenwinkel

Measures

Central heating with gas fired condensing technology

Heat-protective glazing

Insulation of the facade and of the cellar ceiling with ecological insulating materials

Insulation of the top floor ceiling

Insulation of the garage door system

Basic data

Year of construction:
1974

Surface Area/An: 445 m²

Primary energy requirement
Before:   190 kWh/m²a
After:     89 kWh/m²a

Energy Savings: 53 %

CO2-reduction: 10.100 kg/a

Single family house in Berlin-Wannsee

Measures

Central heating with gas fired condensing technology

Solar thermal technology

Ventilation and heat recovery

Insulation of the facade with ecological insulating materials

Insulate basement ceiling

Basic data

Year of construction:
1999

Surface Area/An: 294 m²

Primary energy requirement
Before:   307 kWh/m²a
After:     153 kWh/m²a

Energy Savings: 49,8 %

CO2-reduction: 44.524 kg/a

Villa in Berlin-Lichterfelde

Measures

Gas fired condensing technology

Insulate basement ceiling

Insulation of the roof 30 cm

Triple heat-protective glazing

Basic data

Year of construction:
1896

Surface Area/An: 375 m²

Primary energy requirement
Before:   395 kWh/m²a
After:     165 kWh/m²a

Energy Savings: 59 %

CO2-reduction: 27.967 kg/a